Phase I – Feasibility & Risk Reduction
- Validate control architecture performance
- Bench-test safety override thresholds
- Assess response latency under controlled conditions
- Confirm retrofit integration feasibility
Phase II – Prototype Optimization
- Environmental durability testing
- Calibration precision refinement
- Acoustic variability testing
- Controlled scenario safety validation
Phase III – Pilot Validation
- Limited controlled residential pilot
- Performance data collection
- Failure mode analysis
- Regulatory pathway assessment
Each phase includes measurable technical milestones and validation checkpoints.